Matthews Arena Scoreboard

// Friday March 16, 2018

  Project Information Location: Matthews Arena Project Manager: Ian Parks Square Feet:    A new state-of-the-art center-hung scoreboard and sound system was installed in the historic Matthews Arena.  Designed and manufactured by Daktronics, the scoreboard features two 47.8’ x 13.5’ curved video displays as well as two 9.5’ x 13.5’ end displays and a hoist system for […]

Read more

225 Terry Ave. – Seattle

// Friday March 16, 2018

  Project Information Location: Seattle Campus – Washington Project Manager: David Pereira Square Feet: 18,121   Create a new flexible collaborative zone.    

Read more

Carter Air Structure

// Friday March 16, 2018

  Project Information Location: Carter FieldProject Manager: Ian ParksSquare Feet:    The Carter Air Structure, which rises 72 feet above the ground at its peak height, allows the field to be used year-round by thousands of Northeastern students and city residents for sports and other recreational purposes. The covered field, which is expected to open to Northeastern […]

Read more

Power Outage on 10/11/17

// Thursday March 15, 2018

The second phase of an important electrical upgrade at Ell Hall requires the methodical switching of other select buildings to properly re-connect Ell to our high-voltage distribution.

Read more

Vehicle Restriction Map 

// Thursday March 15, 2018

Information on campus vehicle restrictions, guest parking, and other vehicle violations.

Read more

Interactive Campus Map

// Thursday March 15, 2018

Information on directions, parking, and maps to the Northeastern’s campus

Read more