Pedestrian Bridge Achieves Envision Bronze Award

// Wednesday July 8, 2020

The ISEC Pedestrian Bridge (PedX) achieved an Envision Bronze award for sustainable infrastructure. The project enhanced and restored public space along Columbus Avenue and maximized the use of durable materials with recycled content.

Read more

LEED Gold Achieved for Interdisciplinary Science and Engineering Complex (ISEC)

// Tuesday July 7, 2020

The Interdisciplinary Science and Engineering Complex (ISEC) achieved a LEED Gold Certification by adopting a number of measures.

Read more

Northeastern’s LEED Certified Projects

// Tuesday July 7, 2020

Northeastern has 7 LEED certified projects including International Village the first certified campus building in 2010. All new building projects are required to meeting a LEED Gold standard and achieve high energy efficiency standard.

Read more

Veterans Memorial

// Wednesday April 24, 2019

  Project Information  Location: Axis of Snell Library and Centennial Common Project Manager: Mark Bontempo Square Feet: 3,000   The simple yet elegant memorial, located at the intersection of Forsyth Street and Centennial Common, features a single black granite wall. The front of the memorial, which faces Centennial Walk, is ideal for ceremonial and public observances. […]

Read more

Anechoic Chamber

// Wednesday April 3, 2019

  Project Information Location: Innovation Campus, Burlington, MA Project Manager: Andraya Lombardi Square Feet: 30,000 sf exterior drone cage + 5,700 sf    The Unmanned Aerial Systems (UAS) Lab is located at Northeastern University’s Innovation Campus in Burlington, MA (ICBM) in the south wing of Byron K. Elliott Hall at 147 South Bedford St, Burlington, […]

Read more

Matthews Arena Scoreboard

// Friday March 16, 2018

  Project Information Location: Matthews Arena Project Manager: Ian Parks Square Feet:    A new state-of-the-art center-hung scoreboard and sound system was installed in the historic Matthews Arena.  Designed and manufactured by Daktronics, the scoreboard features two 47.8’ x 13.5’ curved video displays as well as two 9.5’ x 13.5’ end displays and a hoist system for […]

Read more

225 Terry Ave. – Seattle

// Friday March 16, 2018

  Project Information Location: Seattle Campus – Washington Project Manager: David Pereira Square Feet: 18,121   Create a new flexible collaborative zone.    

Read more

Carter Air Structure

// Friday March 16, 2018

  Project Information Location: Carter FieldProject Manager: Ian ParksSquare Feet:    The Carter Air Structure, which rises 72 feet above the ground at its peak height, allows the field to be used year-round by thousands of Northeastern students and city residents for sports and other recreational purposes. The covered field, which is expected to open to Northeastern […]

Read more